This Blog is about
Additional References

Execution
<><>The contractor shall ensure that the the Termiticide emulsion is supplied in sealed containers and diluted as recommended by manufacturer. Contractor shall verify and conform to appropriate methods for handling, disposal, storage and transportation. Extent of treatement areas shall be verified and established. The contractor should make sure that site is ready to receive treatment as per the manufacturer's instructions before works commencement. The contractor should ensure protection to all works and persons on site and provide all necessary facilities and aid for this purpose. Adequate vapour barrier should be available and provide after application.
- Provision of termite proofing and chemical barrier against termite infiltration into the building and ensure subterranean termite control.
- Subterranean termites: Their prevention and control in buildings
- Preventing Damage to Buildings By Subterranean Termites And Their Control
- Termite Control - Prevention And Control Of The Western Subterranean Termite
- Excavation and back-filling required for injection of anti-termite chemicals
- Back-filling and compaction of excavated areas upon completion of construction and /or installation of underground services
- Protection measures consisting of materials, constructions and methods to save persons from harm and property from damage resulting from work performed by the above mentioned activities.
- Relevant Municipality Pest Control Regulations.
- Approved Manufacturer's Technical Brochures such as DOW, ELANCO
, ZENECA PUBLIC HEALTH.
Additional References
- The Holy Grail of termite control? New treatment on the way from DowElanco.
- How To Win Your War Against Termites - Discover Some Of The Most Effective And Time-Proven Methods To Get Rid Of Termites!
- How to Prevent Termite Intrusion
- Building Defects: Termite, Reinforced Concrete, Condensation, Dry Rot Treatment, Structural Failure, Frost Heaving, Termite Pre-Treatment
- Termites: Termite, Formosan Subterranean Termite, Nasutitermes Corniger, Termite Pre-Treatment, Eastern Subterranean Termite, Amitermitinae
- How to Prevent Termite Intrusion In Your Home
- How To Get Rid of Pesky Termites
- Termite Control - How To Prevent Termites - Who Else Wants To Know All There Is To Know About Termites And How To Get Rid Of Them Faster Than You Ever Thought Possible?
- Win The War Against Termites
- Proper pre-construction termite treatments:
- Factors to consider when selecting a termite treatment: A guide for consumers considering termite baits & liquid treatments
The Contractor shall submit the following:
- Method statement and shop drawings for full treatment systems including complete details of subterranean treatment including pre-construction treatment Horizontal barriers, Vertical Barriers.
- Reports specified under Field Quality control and necessary certificates from manufactures and municipal authorities.
- Guarantee: On completion of Treatment all in respects, The Pest control Contractor shall provide a certificate of Guarantee that the treated areas are safe from Subterranean termite attack and infection for at least twenty years.
Products
Materials shall be from one of the following or as approved by local Authorities:
- DURSBAN 4 TC (CHLOROPYRIFOS 45.2%W/W active ingredient) from DOW ELANCO-UK
- DEMON TC (CYPERMETHRIN)250 g/lit active ingredient from ZENERCA PUBLIC HEALTH - UK
- BIFLEX-TC (BIFEN TINRIN-METHYL-DIMETHYL) 25.1% active ingredient. Termiticide- FMC Corporation UAS
Or similar products like
36.8% Permethrin SFR Multi Use Pest Insecticide / Termiticide ~ Roach Fleas Ticks etc.. 32 oz Price: $30.95 | |
Agent Gold Termiticide ( Gallon ) Price: $125.00 List Price: $140.00 | |
Dominion 2l, Professional Termite Control,termidor,termiticide Concentrate Price: $49.99 | |
Bora Care Termiticide Insecticide Fungicide Concentrate Price: $79.95 | |
Premise Foam Termiticide,termite Spray Price: $16.31 | |
Cyper TC Multi Use Insecticide / Termiticide 1 gallon Flea , Tick, Roach, Termite etc. Control Price: $41.95 |
Execution
Applicationa) Horizontal Barriers (Concentration as recommended by manufacturer) PrecautionsPrecautions shall be taken not to disturb the treated areas be re-leveling, digging or earth filling, as this will break the chemical barrier. In case of such situation arises, the area is to be treated again to restore the chemical barrier. Only Qualified and experienced staff and holder of Municipality ID card will conduct the operation/ application taking into consideration all safety measures in providing protective masks and ancillaries. |
| ||||||||||||||||||||